Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 24 results ...

Alumbugu, P O (2019) Construction material logistics management: the case of north-central Nigeria, Unpublished PhD Thesis, , Nelson Mandela University.

  • Type: Thesis
  • Keywords: time overrun; construction project; automation; collaboration; integration; logistics; manufacturing; Nigeria; construction cost; professional
  • ISBN/ISSN:
  • URL: http://hdl.handle.net/10948/44879
  • Abstract:
    The Management of Construction Material Logistics Systems plays a significant role in meeting the goals of cost, quality and time to completion of a construction project. Studies have revealed that the cost of construction materials is usually about 50%-60% of the total cost of the project and that the logistic cost accounts for between 17%-35% of the cost material. Fundamentally, it is accepted that any inefficiency in the delivery of construction material could lead to a time overrun and thus, a rise in construction costs addressing the operational performance of logistics would have a positive impact on the goals of a construction project. The aim of this study was to investigate and evaluate the operational performance of material logistics in North-Central Nigeria as there is little specific research conducted on its effectiveness and efficiency. The methodology used included an extensive literature review and a field study conducted on ten quantitative approach that is rooted in the positivist paradigm, and purposive sampling techniques, was adopted. The descriptive method of data analysis was employed, and the findings and interpretations presented through graphs and images. Analysis of the findings led to the conclusion that material logistics did not operate as a system. There was almost no collaboration and integration of the logistics systems to create a synergistic interrelationship between functions in pursuit of higher overall effectiveness and efficiency. Improvement was needed in warehouse and transport operations and processes; technology and automation of logistics operations were absent, and delivery of material to customers was not effective. The implication was that the current materials logistics system did not meet the delivery goals of cost, quality and time of a construction project. The recommendations suggested included the adoption of the framework developed in this study. This would serve as a guide towards effective and efficient logistics management for material manufacturing firms, and for construction professionals.

Binqela, L (2019) The influence of briefing on Eastern Cape government project outcomes, Unpublished PhD Thesis, , Nelson Mandela University.

Camngca, V P (2020) Underutilisation of information communication and technology in the building construction industry case study: Department of Public Works in the Amathole district in the Eastern Cape, Unpublished PhD Thesis, , Nelson Mandela University.

Chigara, B (2018) Integrating sustainability principles in construction health and safety management practices in Zimbabwe, Unpublished PhD Thesis, , Nelson Mandela University.

Gogela, N (2019) Quality in low-cost houses in Nelson Mandela Bay, Unpublished PhD Thesis, , Nelson Mandela University.

Ibrahim, K (2019) A framework for ethical sourcing of construction materials, Unpublished PhD Thesis, , Nelson Mandela University.

Jesumoroti, C O (2018) Motivation of construction workers in the nelson Mandela Bay Metropole, South Africa, Unpublished PhD Thesis, , Nelson Mandela University.

Koopman, K L (2023) Implementation of technological innovations within the South African construction industry, Unpublished PhD Thesis, , Nelson Mandela University.

Lombard, D (2019) Critical success factors of South African construction companies, Unpublished PhD Thesis, , Nelson Mandela University.

Lukhele, T M (2023) A systematic risk management model for construction project management: a case study of the new infrastructure project in the University of Mpumalanga, Unpublished PhD Thesis, , Nelson Mandela University.

Mafuya, N (2018) Challenges facing the state of construction health and safety management practices within the Eastern Cape: a case of the Sarah Baartman District, Unpublished PhD Thesis, , Nelson Mandela University.

Mangezi, W (2019) Red tape in upgrading of informal settlements in Nelson Mandela Bay, Unpublished PhD Thesis, , Nelson Mandela University.

Mazondwa, S (2019) The delivery of low-income housing in Sarah Baartman District from 2012 to 2017, Unpublished PhD Thesis, , Nelson Mandela University.

Monyane, T G (2019) A lean-led-evaluation of infrastructure development improvement programme in South Africa, Unpublished PhD Thesis, , Nelson Mandela University.

Motau, S M (2019) Quality of subsidised housing in South Africa and the role of the National Home Builders Registration Council, Unpublished PhD Thesis, , Nelson Mandela University.

Mvandaba, N (2020) Corruption elimination within the public infrastructure sector in the Eastern Cape, Unpublished PhD Thesis, , Nelson Mandela University.

Neethling, J P (2020) Invalid submission of extension of time claims in the South African construction industry, Unpublished PhD Thesis, , Nelson Mandela University.

Obiozo, R N (2018) The role of psychosocial recuperative therapy in enhancing construction performance on projects, Unpublished PhD Thesis, , Nelson Mandela University.

Phalanndwa, S A (2018) Cost and time overruns on Mpumalanga Province infrastructure projects, Unpublished PhD Thesis, , Nelson Mandela University.

Sisilana, O (2018) Construction company joint ventures in South Africa, Unpublished PhD Thesis, , Nelson Mandela University.

Sisilana, V (2018) Labour and external stakeholder management in construction projects, Unpublished PhD Thesis, , Nelson Mandela University.

Taft, G S (2019) The sustainability of small, medium and micro enterprises within the Nelson Mandela Bay Metropole, Unpublished PhD Thesis, , Nelson Mandela University.

Tyindyana, X (2019) The challenges of professional women in a male dominated South African construction industry, Unpublished PhD Thesis, , Nelson Mandela University.

Xongo, N (2018) Causes and impacts of delays in low-income housing projects in the greater Nelson Mandela Bay and Buffolo City Municipality, Unpublished PhD Thesis, , Nelson Mandela University.